SureCrete installed 20,000 linear feet of duct bank to support the revamp of this runway at Dallas-Fort Worth airport.
Electrical work to support the airstrip lighting pads were installed along the runway.
The SureCrete team paved approximately 175,000 sq. ft. of concrete for a parking lot at the VA Medical Center in Dallas, Texas. The largest single pour was 700 cubic yards, and the project was bonded and insured for $1,200,000.